San Diego ADU Builder

ADU builder in San Diego, from first sketch to move-in

Detached ADUs, garage conversions, attached units and JADUs. We draw the plans, get the City of San Diego permit and build it, so you deal with one licensed team the whole way.

$40k–$300k+
Typical ADU budget
6–12 months
Consultation to move-in
Plans + permits
Handled in-house
CSLB #1153455
Licensed & insured
Pricing

What does an ADU cost in San Diego?

These are realistic 2026 ranges for San Diego. Size, site work, utility runs and finishes decide where your project lands. New construction generally runs about $250–$450 per square foot.

Junior ADU (JADU)

$40k–$80k

A unit of up to 500 sq ft carved out of your existing home, with its own entrance and efficiency kitchen.

Garage conversion

$80k–$150k

Your existing garage becomes a legal living unit. The slab, walls and roof are already there, which keeps cost down.

Attached ADU / addition

$100k–$200k

New living space joined to the main house, sharing a wall and often the utilities.

Detached ADU

$150k–$300k+

A stand-alone backyard home. Example: a 600 sq ft unit typically lands between $150k and $270k.

Typical 2026 San Diego ranges, not a quote. You get an itemized, fixed price after a free site visit. Read the full San Diego ADU cost guide

ADU Construction by XLNC Builder in San DiegoADU construction
What's included

Everything an ADU needs, under one contract

Most ADU delays come from the hand-off between a designer, a permit runner and a builder. We keep all three in one team, so the plans we submit are the plans we build.

Feasibility & site review

We check setbacks, utilities, sewer lateral and fire access on your lot before anything is drawn.

Design & permit set

Floor plans, elevations, structural and Title 24 drawings prepared for the City of San Diego or County review.

Construction & inspections

Foundation to final: framing, MEP, finishes and every city inspection, run by one project manager.

Rental-ready finishes

Durable kitchens, baths and flooring chosen for tenants or family, plus mini-split HVAC and separate metering where needed.

Process & timeline

How your project runs

One project manager from the first visit to the final walkthrough.

01

Free site visit

1 week

We walk the lot, talk goals and budget, and tell you which ADU type fits.

02

Design & permits

2–4 months

Plans drawn, submitted and taken through city review.

03

Construction

3–6 months

Build, inspections and weekly updates from your project manager.

04

Final & move-in

1–2 weeks

Final inspection, certificate and a walkthrough before handover.

Recent work

Projects from our San Diego portfolio

8354 Adams Street, detached adu back unit in San Diego
8354 Adams StreetDetached ADU back unit
1059 Gillespie Drive, home remodel in San Diego
1059 Gillespie DriveHome remodel
455 East Lincoln Avenue, home remodel in San Diego
455 East Lincoln AvenueHome remodel

See all projects

Client reviews

What San Diego clients say

★★★★★
Before finding XLNC Builder, another company left me with headaches and plans the city rejected. From day one XLNC was professional and knowledgeable, walked me through the entire process, and their pricing was very reasonable.
HassanADU owner · San Diego
★★★★★
They fit every feature we wanted into the footprint while keeping us within San Diego's strict zoning limits, and turned our rough ideas into a technically perfect permit set.
VishalThree ADUs · design & permits
★★★★★
XLNC Builder, with Nancy and her dedicated, professional team, has been a reliable guide across my construction projects. I'm fortunate to count on them.
RichardDeveloper & contractor · San Diego

Licensed, bonded and insured. Verify CSLB license #1153455

Questions

ADU Construction: frequently asked questions

Most San Diego ADUs cost between $80,000 and $300,000. Junior ADUs start around $40,000, garage conversions typically run $80,000 to $150,000, and detached units can reach $300,000 or more depending on size, site conditions and finishes.
Plan on 6 to 12 months from first consultation to move-in. Design and permitting usually take 2 to 4 months, and construction takes 3 to 6 months once the permit is issued.
Yes. We prepare the full permit set, submit it, answer plan-check comments and schedule every inspection through final. You do not need to hire a separate designer or permit expeditor.
Usually, yes. A garage conversion reuses the existing foundation, walls and roof, so it typically costs $80,000 to $150,000, compared with $150,000 to $300,000 or more for a new detached unit.
Yes. Long-term rental of an ADU is allowed in San Diego, and many owners earn roughly $1,500 to $3,000 per month depending on location and size. Short-term rental rules are stricter, so we will flag what applies to your lot.

Areas we serve

Based in Mira Mesa (9400 Activity Rd), we work across San Diego County, including:

  • Mira Mesa
  • Scripps Ranch
  • Rancho Bernardo
  • 4S Ranch
  • Poway
  • Carmel Valley
  • La Jolla
  • Del Mar
  • Clairemont
  • North Park
  • Point Loma
  • Tierrasanta
  • Encinitas
  • Carlsbad
  • Escondido
  • Coronado
  • Chula Vista
Free quote

Tell us about your project

We reply within one business day to set up a free site visit. No pressure, no hidden fees.

Prefer to talk now?Call or text (619) 836-0099

Itemized, fixed quote

Every line priced before work starts.

Plans, permits and build in one team

One project manager, start to finish.

Licensed, bonded & insured

CSLB #1153455, Class B General Building.

Get your free ADU quote

Takes 30 seconds. Fields marked * are required.

Thanks! Your request is in. We'll be in touch within one business day.
Please enter your name.
Please enter a valid phone number.
Please enter a valid email address.
Please choose a project type.
Call now Free quote